ongoing projects

>> For Construction of Advanced Computing Design Engineering Centre (ACDEC) for Aerospace and Defence Industries at Vallam Vadakal, Sriperumbudur Kancheepuram District Tamil Nadu State

>> Construction of Nine (09) nos. Elevated Metro Stations excluding viaduct viz. PCMC, Sant Tukaram Nagar, Bhosari, Kasarwadi, Phugewadi, Dapodi, Bopodi, Khadki and Range Hill on Corridor -1 of Pune Metro Rail Project.

>> Construction of (08) Nos. Elevated Metro Rail Station Excluding Viaduct in Station Portion Viz. Vanaz, Anand Nagar, Ideal Colony, Nal Stop, Garware College, Deccan Gymkhana, Sambhaji Park & PMC on Corridor-2 of Pune Metro Rail Project

>> Construction of 50 bedded rural Hospital & 46 Staff Quarters at Naldurg Tq Tuljapur district Osmanabad.

>> Construction of New Court Building (G+3) at Omerga, Tq. Omerga, District Osmanabad.

>> Construction of 50 bedded rural Hospital & 46 Staff Quarters at Naldurg Tq Tuljapur district Osmanabad.

>> Construction of New Court Building (G + 3) at Omerga, Tq.Omerga, District Osmanabad.

>> Construction Of Forensic Science Laboratory & 27 Quarters At Gut No. 75 (Part) At Vishnupuri, Nanded, Dist. Nanded.

>> Upgradation of Omerga to Ausa Section of NH-548 B from km 249/200 to km 201/400 to two lanes with paved shoulder configuration [Omerga-Ausa -Latur-Renapur-Pangaon-Dharmapuri-Parali-Injegaon road design chainage km 0/00 (Omerga) to km. 47/800 (Ausa) (length-47.80 km)] in the State of -Maharashtra on EPC mode under NH(O).

>> PN 53 PN-53 District Border to Mungashi Aran Karkamb Pandharpur Raod, MDR-133,km 0/00 to 72/200, Dist -Solapur (Part - District Border to Pandharpur km 0/000 to Km 82/300 excluding overlap length of 4.81km.

>> EPC AU-II (39C) - Improvement to Bembli Umaregavhan Patoda Lohara Narangwadi Kasarshirsi Road SH-237 Km 14/800 to 55/700 (Part- SH-211 Lohara To Latur District Border) (Total 40.600 Km) Dist. Osmanabad on EPC mode

>> EPC Aravali Makhjan Karjuve - Improvement to Aravali Makhjan Karjuve Dingani Sangmeshwar Road MDR-43 Km 0/00 to 45/120 Tq. Sangmeshwar Dist. Ratnagiri on EPC mode

>> EPC AU- II (37E) - Improvement of Aurangabad Palashi Anjandoh road with CC road (two lane unpaved shoulder) MDR-17 km 1/500 to 22/00 Tq. Aurangabad Dist. Aurangabad

>> EPC KN-II (7A) - Improvements and Widening of Carriageway from 5.5m to 7.0m to N.H. 66 to Talekante Tulsani Devrukh Muradpur Maral Bamnoli Khadikolvan Ozhre Kalakdara Including Maral Marleshwar Branch Road S.H.174 at K.M.25/500 to 53/200 and 0/00 to

>> Construction of Cement Concrete Roads and Drain of D.P.Roads under Maharashtra Suvarna JayantiNagarothan Mahabhiyan Yojana in Muncipal Council,Omerga Area Tq. Omerga Dist.Dharashiv .16 Roads-State of Maharashtra Contract Cost is Including Work Portion+Royalty charges+TestingCharges+Shifting of Electricity poles(L S) and Plantation(L S).

>> Improvement of Kallam Dhoki Ter Bembli Tuljapur Akkalkot Road SH 208

>> EPC 63 - Improvement to SH- 249 to Yerendeshwar Ridhora Palshi Lingi Pimplachore Babhulgaon Asegaon joining to SH- 256 road Km. 0/00 to 29/100 MDR-15 Tal- Basmath Dist- Hingoli

>> Sangamwadi S NO 52 ,54 part yethe Aadhyakrantiguru lahuji Vastad Salve Yanche Smarak Ubharne

>> Construction of Administrative Building and Residential Building for the State Excise Department at Mangalwar Peth Pune.

>> Construction of E bus Sewa Workshop Building

>> construction of new court building with electrification at chandrapur ta and district chandrapur (Budget)

>> Improvemet to Two Lane with Earthern Shoulders Dawari Therban Somthana Kini Palaj Divshi Laglud SH 222 Turathi Bothi Bitnal Somthana Gortha Jamgaon Kudhala Bolsa Bhaygaon Krushnar Road SH 419 Km 42/900 to 58/100 Tq Umri Dist Nanded ( Variation works of Haybrid Annuity Package AU 106) in the state of Maharashtra on EPC Mode

>> The investigation, design, construction, testing, commissioning of works comprising of civil work such as pump house, approach channel, forebays, gated intake structure, manifold, rising main with allied works and delivery chamber of stage 2, 3a, 3b, 4 & 5 and design, supply, installation, testing andcommissioning of pumping machinery, switch yard, HT/LT electric line and allied mechanical, electrical work & SCADA and automation syste, of stahe 1, 2, 3a, 3b, 4 and 5 for lifting water through six different stages including operation and maintainance of entire scheme for five years and handing over to respective authority, under lift irrigation scheme no.1 of Krishna Marathwada Irrigation Project Dist. Osmanabad State Maharashtra

>> Performance based Maintenance Contracts (PBMC) of Omerga to Ausa section of NH-548B from km 201/400 to km 249/200 [total project length 47.800 km] in the State of Maharashtra